Robert Maillart’s concrete arch near Schiers, from the competition drawing to the repair of a working road.
Robert Maillart designed the Salginatobel Bridge near Schiers in Graubünden, Switzerland. Completed in 1930, its three-hinged concrete arch spans 90 metres.
The people restoring the Salginatobel Bridge in the 1990s faced a constraint Robert Maillart would have recognised. The bridge carried the road to Schuders. For most of the work, the road had to stay open. A concrete arch whose construction had attracted international attention was still doing the ordinary job for which the community had commissioned it.
Maillart designed the bridge near Schiers, in the Swiss canton of Graubünden. It was built in 1929 and 1930. The arch spans 90 metres across the Salgina ravine. Seen in profile, the road and the curve beneath it look like separate strokes. A cross-section explains why the two belong together.
In Short
- Maillart won the 1928 competition with the lowest-priced of nineteen proposals.
- The concrete deck, arch and walls along the bridge form a hollow section.
- The canton repaired the crossing in 1997 and 1998 while maintaining the road connection for most of the works.
Picture Notes
These notes describe the AI illustration shown with this article, not photographs of the real place.
1. Lead illustration: Angled exterior view — AI illustration — an angled exterior view that reads the building's depth, showing the built form with a warm palette.
The price on the table
Before it became a landmark, the crossing was a choice among bids. ETH Zurich’s account of the competition puts Maillart first on price. The practical question was how to carry the Schiers–Schuders road across the ravine. Nineteen proposals gave the client a basis for comparison. The profile people now admire belonged to the least expensive submission.
There is a paper trail between that decision and the completed bridge. ETH Library identifies pages from Maillart’s engineering office calculations dated 1 June 1929 in Geneva. The reference is Hs 1085:1929/30-1:168/11. It gives the competition a human scale. Someone had to turn a chosen scheme into a set of calculations that could be checked. The archive preserves a point along that journey, between the bid in 1928 and the completed crossing in 1930.
What the section reveals
Start with the road deck and follow one edge lengthwise. The American Society of Civil Engineers describes walls running along the span that connect the deck to the arch ring underneath. A cut across these elements gives the box section its name. The upper surface, side walls and curved lower member define an interior space. A continuous mass of concrete would give a very different answer to the same drawing exercise.
Three hinges are part of Maillart’s arch design. The rock on either side of the ravine provides support for the arch. ASCE also records reinforcement in the arch and the upright walls to control cracking. Those details give the bridge a more precise identity than a description of its slenderness alone. In a side view you can follow the curve across the gap. In section you can ask which parts of the crossing work together. Each view tells you something the other leaves out.
The structure that came down
Construction adds a third way to read the bridge. The bridge’s technical guide credits Richard Coray with the falsework. That is the temporary support used during construction. ASCE identifies staged construction of the arch as a significant part of Maillart’s scheme. The finished outline tells us where the concrete ended up. Coray’s separate credit reminds us to ask what made it possible to put it there.
A temporary structure presents an unusual question for architectural history. Its disappearance is part of a successful outcome. A visitor can study the concrete remaining over the ravine, while the work that supported it during construction has to be recovered through records. Naming both the designer and the falsework builder gives their distinct contributions a place in the account without asking a photograph to prove a construction sequence.
Repairing a road in use
A problem at the Schiers end required attention in 1991. The cantonal public works office says the end of the bridge was altered so that movement of the slope would no longer press against it. That intervention addressed the relationship between ground and structure. The later campaign dealt with the concrete bridge itself.
In its October 1998 report the office describes damaged parapets being replaced, repairs to the surfaces of the arch and piers, and a new road surface with waterproofing. The team took care to preserve the appearance of the bridge. This is a useful distinction when looking at a historic structure. A familiar outline can survive a substantial replacement of material. The parapets are a particularly clear example because they belong both to the visible edge of the deck and to its daily use as a road.
Traffic shaped the sequence. The report identifies this route as the only road connection to Schuders at the time. It records brief closures for laying the waterproofing and road surface. Keeping the crossing serviceable for the rest of the operation was part of the work. For a resident waiting to get home, that detail may convey more about the restoration than its final appearance.
ARCHITECTT Note
Try reading this bridge with three simple drawings. In elevation, trace the road and the arch. In section, mark the space inside the concrete box. On a third sheet, trace the route between Schiers and Schuders and mark the crossing. The first drawing describes a form, the second makes its construction legible, and the last explains why the repair team had to plan around traffic. The same strip of concrete belongs in all three.
FAQ
Who designed the Salginatobel Bridge?
Robert Maillart designed the crossing. The bridge guide separately credits Richard Coray for the temporary falsework used to build it.
What does the 90-metre measurement describe?
ETH gives 90 metres as the span of the arch. It measures the distance crossed by that structure. The total length of the road bridge is a separate dimension.
What did the later repair change?
The canton records concrete surface repairs, replacement parapets and new waterproofing beneath the road surface in 1997 and 1998. The stated aim was to retain the bridge’s form and appearance while keeping the route in service.
In Short
Salginatobel Bridge carries the Schiers–Schuders road across a 90-metre reinforced-concrete arch designed by Robert Maillart.
Key takeaways
- —The winning scheme was the lowest-priced of nineteen entries in 1928.
- —ETH Library holds a dated record of Maillart’s bridge calculations.
- —The cantonal public works report distinguishes the slope intervention from the later concrete repair campaign.
Sources
- Maillart won the 1928 competition with the lowest-priced of nineteen proposals. The completed arch spans 90 metres. ETH records calculations dated 1 June 1929.https://library.ethz.ch/en/collections-and-archives/short-portraits/robert-maillart-1872-1940.html
- Longitudinal concrete walls join the arch and deck to form a hollow box. The rock supports the arch, and ASCE describes staged construction and reinforcement to control cracking.https://www.asce.org/about-civil-engineering/history-and-heritage/historic-landmarks/salginatobel-bridge/
- The bridge’s technical guide credits Richard Coray with the falsework and lists construction in 1929–30.https://www.xn--salginatobelbrcke-g3b.ch/s/Flyer_DE.pdf
- The canton identifies the road between Schiers and Schuders, the 1991 slope intervention and the 1997–98 repairs. Traffic continued except for brief closures for the road surface and waterproofing.https://www.gr.ch/DE/institutionen/verwaltung/diem/tba/dokumentation/Dokumentation%20TBAinfos%20PDF/tba-info-32_salginatobelbruecke.pdf